Prefabricated light steel villa house construction as a modular residential project

 Prefabricated light steel villa prefab house structure for residential use(I)Primary structure for steel construction buildingLight steel keelWall system: 140/89mm; Roof system: 70mm(Q550 Galvanized) (II)MAINTENANCE of light gauge steel construction buildingEXTERNAL WALL27mmPU EMBOSSED STEEL PANEL+HOUSE WRAP+12mm

Featured Products

 

Prefabricated Light Steel Villa House Building as Modular Home Project

Prefabricated light steel villa prefab house structure for residential use



Prefabricated Light Steel Villa House Building as Modular Home Project

(I)

Primary structure for steel construction building

Light steel keel

Wall system: 140/89mm; Roof system: 70mm(Q550 Galvanized)

 

(II)

MAINTENANCE of light gauge steel construction building

EXTERNAL WALL

27mmPU EMBOSSED STEEL PANEL+HOUSE WRAP+12mmOSB BOARD+150mm INSULATION GLASS WOOL+12mm WATERPROOF GYPSUM BOARD

INTERNAL WALL

12mm WATERPROOF GYPSUM BOARD+150mm INSULATION GLASS WOOL

FALSE CEILING  

0.5mm COLOR STEEL SHEET

9mm GYPSM BOARD

FLOOR SUPPORTING BOARD  

1mm GALVANIZED MODELED FLOOR SUPPORTING BOARD

GALVANIZE

FLASHING EDGING

0.5mm SELF FOLDING COLOR STEEL SHEET

DOOR    

1200*200mm STEEL DOOR

960*2050mm STEEL DOOR

800*210mm PVC MODELED DOOR

700*210mm PVC MODELED DOOR

 

 

(III)  

FITTINGS  of steel construction building

HARDWARE

 

RAINWATER SYSTEM  

75*50mmPVC RECTANGULAR TUBLE

PVC EAVES GUTTER(WITH ACCESSORIES)

ELECTRICITY

LIGHTS, SWITCHES, SOCKETS, DISTRIBUTION BOX


Prefabricated Light Steel Villa House Building as Modular Home Project
Prefabricated Light Steel Villa House Building as Modular Home ProjectPrefabricated Light Steel Villa House Building as Modular Home Project

 

1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
 
FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers' request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff's health and safety.

 

2.What's your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 30 days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of light steel keel structure is 50 years

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours